Our team have been working hard across the border in Scotland!
We have recently completed a floodlight upgrade for Scottish Championship side, Arbroath FC. As you can see, our team had to hit the heights to work on the ground’s floodlights – and we’re delighted to announce that all works were completed as planned.
Achievements And Services Provided:
JHP installed 42 MS fittings to existing columns adjusting/angling to suit
the provided design and fixing pest control to each fitting for added
protection.
Weather conditions were a big factor on this job as working at such a
height on the coast can present a big risk. This was managed following all
Heath and Safety regulations and the project was completed smoothly.
New enclosure boxes were installed to the base of the masts to ensure
longevity to the control gear for the newly installed fittings, this is a must
when you don’t have the option to mount the drivers into the base of the
masts!
Once the installation was complete, Electrical testing was completed in
accordance to BS 7671:2018 and a NICEIC digital minor works certificate
was provided for all relevant works.
Once the lights had been installed and all was in working order, JHP
returned back to Arbroath to carry out a lux level report, this provided the
club with a certification that the lux levels were being achieved. This is a
MUST for any new LED install.
Working in collaboration with Midstream Lighting.